The solution that Smartmatic has proposed for Transcaribe's Integrated Fare Collection and Fleet Control System includes the development, implementation, deployment and coordination of a series of services and systems, with an initial implementation time of 10 months before operation begins.

Among the main technological components of our offer, we can highlight: the platform for the integrated fare collection system, the command and control center, redundant (mirror) databases, wireless and fiber-optic telecommunication networks, the equipping of 17 pay zones (stations with ticket booths and turnstiles) and of 719 buses with card validators/top-up machines and integrated turnstiles.  

Also, in a direct interaction with the users, Smartmatic will be able to manage the distribution of 300,000 courtesy cards, as well as the sale of the Contactless Smart Cards and their top-up at points of sale (634 planned), or in the vehicles. The project also involves the design of a user communication and information campaign, so that the system is used efficiently. 

As part of the maintenance services, we include the supply of a stock of spare parts, a permanent technical support center and previsions for the growth of the system, and for the replacing and updating of equipment.

  • Integrated Fare Collection and Fleet Management System.
  • Command and Control Center. 
  • Redundant databases (mirrors).
  • Furnishings of 17 pay zones (stations with ticket booths and turnstiles)
  • Furnishings of 719 buses with card readers / top-up machines and turnstiles integrated with the collection system.
  • Card top-up inside the vehicles.
  • Distribution, sale and top up of Contactless Smart Cards - 300,000 courtesy cards. 
  • Wireless and fiber-optic telecommunication networks.
  • 634 Points of Sale.
  • User communication and information campaign.
  • Stock of spare parts.
  • Permanent technical support center.
  • Previsions for the growth of the system, replacing and updating equipment.
  • Implementation Time: 10 months before operation begins.